top of page

ICS Integrated Cryocooling System

An electro-mechanical, LN₂-free cooling solution for HPGe

 

Please add items to the cart and submit them for a quotation.

Quantity

Key Highlights

  • No liquid nitrogen required: Provides LN₂-free cooling with no loss of detector performance.

  • Advanced cryogenic technology: Uses industry-proven Sunpower Stirling cooler with Active Vibration Cancellation (AVC™) for low vibration and low noise.

  • High reliability: Mechanical cooler with MTTF > 200,000 hours and maintenance-free design.

  • Immediate recovery: Hardened cryostat versions (ICS, ICS-E) allow instant cooldown after power loss without full thermal cycling.

  • Versatile models: Available in multiple versions, including ICS-E, ICS-HJ (hardened cryostat), and ICS-P4 (PopTop compatible).

Description

The ICS Integrated Cryocooling System is ORTEC’s advanced electro-mechanical cooling solution for high-purity germanium (HPGe) radiation detectors that eliminates the need for liquid nitrogen. It uses a sealed cryostat with a Stirling cooler, providing stable and efficient cryogenic temperatures with minimal vibration and low audible noise. This system is compatible with a wide range of detector models and is suitable for many applications where LN₂ refill and maintenance are impractical.

Specifications

Compatibility: ORTEC GEM, GMX, and PROFILE HPGe detectors. Cooler: Sunpower Stirling with AVC™. All-attitude operation: Yes. Power Supply: 100–240 V AC, 50/60 Hz. Noise: < 55 dBA at 1 m (at < 30°C ambient). Environmental: -10 °C to 40 °C, non-condensing humidity. Vacuum Longevity: > 5 years @ 25°C. Cooler Life: > 200,000 hours. Typical Power: ~ 70–80 W typical, 130–200 W max (model-dependent).

Application

  • Gamma spectrometry laboratories where liquid nitrogen handling is impractical.

  • Industrial and nuclear facilities requiring reliable, continuous operation.

  • Environmental, health physics, and safeguards applications with low noise and high resolution requirements.

  • Field or mobile installations where LN₂ supply isn’t available.

bottom of page